Design leader
Roles in construction projects: analysis and terminology, by Hughes, W. and Murdoch, J. R, published in 2001 by the University of Reading, suggests that design leadership is: ‘This is the most important function in the project, involving ascertaining what has to be done and why. This person usually has responsibility for eliciting the brief in dialogue with the client, developing the overall design concept (design philosophy) for the project, co-ordinating the design of others, producing the design documentation, negotiating with the local planning authority, inspecting the work as it progresses, clarifying constructional details, etc.’
For more information see: Lead designer.
[edit] Related articles on Designing Buildings
- Appointing consultants.
- Architect.
- BIM co-ordinator.
- Collaborative practices.
- Consultant team.
- Designers.
- Design coordination.
- Design coordinator.
- Design liability.
- Design management.
- Design management plan.
- Design manager.
- Design responsibility matrix.
- Lead consultant.
- Lead designer.
- Project manager.
- Services engineer.
- Specialist designers.
- Structural engineer.
- What is design?
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
CIAT confirm the winners of the 2026 architectural technology awards.
Government launches a one stop shop for flood preparedness.
Sir Edwin Lutyens: Britain's greatest architect? Book review.
CIOB publishes free template to help assess and manage risks.
ECA's reflections on Party Conference season
Burnham wants to be confident of winning before asking for a fresh mandate.
New Chief Construction and Scientific Adviser
Sergio Cavalaro, Professor of Infrastructure Systems at Loughborough University.
Building safety levy for England
CIAT publish estimator tool for members.
Water sector faces a growing crisis that could slow the delivery of vital infrastructure.
Undervaluing our industrial past
Heritage value changes as taste for building styles changes.
Changing expectations around competence and compliance
New information sheet from CIAT.
Grenfell investigation files passed to CPS
Angela Rayner apologises on behalf of the British state.
Electrical contractors need to understand the practical implications.

















